Kundanoor Bridge, more commonly written as Kundannoor-Thevara Bridge, is an important road bridge in Kochi, Kerala. The approximately 1.72 km bridge forms part of National Highway 966B and connects the Kundannoor-Maradu side with Thevara, creating a vital road link towards Willingdon Island, West Kochi and the port-related areas of the city.
The bridge opened to the public on 4 January 2000 and has since become one of the busiest local highway links in Kochi. Its importance comes from the mix of traffic it carries: everyday commuters, buses, private vehicles, goods carriers and container lorries all use the Kundannoor-Thevara corridor. The bridge is only two lanes wide, which makes congestion particularly noticeable when traffic volumes rise or maintenance work affects the carriageway.

The bridge was extensively resurfaced in 2024 using Stone Mastic Asphalt, but road-surface problems returned. By August 2026, fresh reports described widespread potholes and damaged surfacing on the bridge, causing slow traffic and safety concerns. The crossing remains operational, but its condition and the continuing demand for additional capacity make it one of Kochi’s most discussed urban bridge corridors.
Quick Overview of Kundanoor Bridge
| Particular | Details |
| Common Name | Kundanoor Bridge |
| More Specific Name | Kundannoor-Thevara Bridge |
| Location | Kochi, Ernakulam district, Kerala |
| Highway | NH 966B |
| Approx. Length | About 1.72 km |
| Traffic Configuration | Two-lane road bridge |
| Opened to Public | 4 January 2000 |
| Reported Construction Cost | About Rs 65.33 crore |
| Main Connection | Kundannoor / Maradu with Thevara |
| Wider Route | Kundannoor to Willingdon Island via NH 966B |
| Nearby Junction | Kundannoor Junction on NH 66 |
| Nearby Areas | Kundannoor, Maradu, Thevara, Nettoor, Vyttila and Willingdon Island |
| Major Traffic | Local vehicles, buses, trucks and container traffic |
| 2024 Major Work | Full resurfacing with Stone Mastic Asphalt |
| Current 2026 Issue | Recurring potholes and traffic congestion |
| Public Transport Hub | Vyttila Mobility Hub |
Where is Kundanoor Bridge Located?
Kundanoor Bridge lies in the southern part of Kochi and connects the Kundannoor-Maradu side with Thevara across the backwater zone. Its eastern end is close to Kundannoor Junction, where NH 966B meets the NH 66 Kochi Bypass.
From the Thevara side, NH 966B continues towards the CIFT Junction and Willingdon Island corridor. This makes the bridge useful not only for Maradu residents but also for traffic moving between the mainland highway network and the port, naval, Thoppumpady and West Kochi areas.
Kundannoor itself is one of Kochi’s most important road junctions because it sits on the NH 66 bypass and connects with routes towards Vyttila, Aroor, Tripunithura and the Thevara-Willingdon Island corridor.
Kundanoor Bridge Route and Road Connectivity
The bridge is part of NH 966B, the short national-highway corridor linking Kundannoor with Willingdon Island. For many motorists, it provides the most direct road connection between the NH 66 bypass and Thevara-side routes.
A typical movement is broadly: NH 66 / Kundannoor Junction -> Kundanoor Bridge -> Thevara -> CIFT / Willingdon Island -> Thoppumpady and West Kochi connections.
- Kundannoor Junction: Major junction linking NH 966B with the NH 66 Kochi Bypass.
- Vyttila: Major city junction north of Kundannoor on NH 66.
- Aroor: Important southbound connection on NH 66.
- Thevara: Main city-side locality reached across the bridge.
- Willingdon Island: Port and transport district reached through the NH 966B corridor.
- Thoppumpady: Important West Kochi junction connected through the wider Willingdon Island road network.
- Tripunithura: Major eastern Kochi destination accessible through roads from Kundannoor and Vyttila.
Why is Kundanoor Bridge Important?
Kundanoor Bridge is important because it ties together several major parts of Kochi’s road network. It links the national-highway bypass at Kundannoor with the Thevara-Willingdon Island corridor and provides a useful route for passenger as well as freight movement.
Heavy goods vehicles and container lorries are a major part of the traffic mix. This is one reason congestion on the two-lane bridge can quickly become severe. When the bridge was completely closed for resurfacing in October 2024, traffic pressure spread to Vyttila, Thoppumpady, Vathuruthy and other parts of the city.
The bridge also provides an alternative urban connection during temporary traffic restrictions elsewhere in central Kochi. Police diversion plans in 2026 continued to route vehicles through Kundannoor when movements around Thevara, MG Road or the central city were restricted.
Traffic Conditions at Kundanoor Bridge
Kundanoor Bridge is a two-lane structure carrying a traffic volume that has grown substantially since it opened in 2000. Congestion is common during weekday peak periods and can worsen when trucks or container vehicles move through the corridor in large numbers.
The narrow bridge creates limited scope for vehicles to pass stalled traffic. Problems on the approach to Kundannoor Junction can also back up onto the bridge, while congestion at Vyttila and on the NH 66 bypass can affect onward movement.
Road-surface deterioration has recently added to these delays. In June 2026, potholes after heavy monsoon rain led to patchwork repairs and long queues. In August 2026, fresh reporting again described widespread potholes, including serious surface failure that exposed the concrete deck in places. The bridge remained in use, but motorists had to slow considerably around damaged sections.
Maintenance and Current Road Condition in 2026
Kundanoor Bridge has undergone repeated road-surface repairs over the years. In October 2024, authorities closed the Kundannoor-Thevara Bridge and the nearby Alexander Parambithara Bridge as part of a larger relaying programme on NH 966B.
The old surface was milled out and replaced using Stone Mastic Asphalt, a road-surfacing method selected because authorities expected it to withstand heat and heavy traffic better than the previous bituminous treatment. Although the closure was initially planned to continue until mid-November, the renovated Kundannoor-Thevara Bridge reopened on 4 November 2024, ahead of schedule.
The improvement did not eliminate the underlying maintenance problem. Potholes returned during the 2026 monsoon, and temporary patching did not fully resolve the congestion. The latest major report located, dated 8 August 2026, described severe pothole formation along the bridge and deterioration of the recently laid surface.
For current commuters, this means the bridge should be considered operational but vulnerable to slow traffic around damaged road sections, especially during heavy rain.
Kundanoor Bridge and Kundannoor Flyover: Are They the Same?
No. The names are easy to confuse because both structures are in the same locality.
Kundanoor Bridge in this article refers to the long Kundannoor-Thevara Bridge on NH 966B. It carries traffic between Kundannoor and Thevara.
Kundannoor Flyover is a separate six-lane flyover over Kundannoor Junction on NH 66. It opened in January 2021 and was built to allow through traffic on the Kochi Bypass to avoid the busy junction below.
Motorists using the area may encounter both structures on the same journey, but they serve different roads and should not be treated as the same bridge.
Demand for More Capacity and Future Road Projects
The two-lane width of Kundanoor Bridge has become a long-term concern as traffic has increased. In 2024, calls for doubling the 1.75 km Kundannoor-Thevara crossing grew after recurring congestion and road deterioration, particularly because of heavy goods and container traffic.
A wider transport solution is also being studied through a proposed four-lane NH 966B port-connectivity corridor from the Nettoor side towards CIFT Junction and Willingdon Island. The project is intended to bypass some of the bottlenecks around Kundannoor, the existing bridge corridor and the West Kochi approaches.
However, the alignment has faced disagreements involving the National Highways Authority of India and Cochin Port Authority. As a result, the planned replacement or parallel connectivity should not yet be described as an approved open alternative to the existing bridge.
Public Transport Near Kundanoor Bridge
Kundanoor Bridge is used by road-based public transport and is reasonably close to one of Kochi’s most important multimodal transport centres.
Vyttila Mobility Hub is the main nearby integrated bus hub, handling city and long-distance bus services. Vyttila is connected to Kochi Metro, and Kochi Metro’s operational station network includes Vyttila and nearby Thaikoodam on the Aluva-Tripunithura corridor.
Local buses, auto-rickshaws and taxis operate around Kundannoor, Maradu and Thevara. Because the bridge itself is a busy highway link, passengers generally board or alight at established stops on the approaches rather than on the bridge deck.
Major Landmarks and Facilities Near Kundanoor Bridge
- Kundannoor Junction: One of the most important highway junctions in south Kochi.
- Kundannoor Flyover: Separate six-lane NH 66 flyover above Kundannoor Junction.
- Le Meridien Kochi: Major hotel near the Kundannoor-Maradu area.
- Crowne Plaza Kochi: Prominent hotel near Kundannoor and the NH 66 corridor.
- Vyttila Mobility Hub: Major integrated bus and transit hub north of Kundannoor.
- Thevara: Important residential, institutional and naval-side locality.
- Willingdon Island: Major port, railway and commercial island connected through NH 966B.
Nearby Areas to Kundanoor Bridge
- Kundannoor: Immediate eastern-side locality and major highway junction.
- Maradu: Municipality containing much of the Kundannoor-Nettoor urban corridor.
- Thevara: Major Kochi neighbourhood on the city side of the bridge.
- Nettoor: Residential and highway locality south-west of Kundannoor.
- Vyttila: Major transport and commercial hub north of Kundannoor.
- Panangad: Residential locality south of Kundannoor along the Kochi Bypass.
- Willingdon Island: Port-oriented district reached through the NH 966B corridor.
FAQs About Kundanoor Bridge Kochi
Q. Is Kundanoor Bridge the same as Kundannoor-Thevara Bridge?
Yes. In local usage, Kundanoor Bridge commonly refers to the Kundannoor-Thevara Bridge on NH 966B. The spelling Kundannoor is also widely used.
Q. Is Kundanoor Bridge the same as Kundannoor Flyover?
No. The bridge is the long NH 966B crossing towards Thevara, while Kundannoor Flyover is the separate six-lane structure over Kundannoor Junction on NH 66.
Q. Is Kundanoor Bridge open in 2026?
Yes. The bridge is operational. However, August 2026 reports describe significant potholes and damaged surfacing that can slow traffic.
Q. When was Kundanoor Bridge opened?
The Kundannoor-Thevara Bridge was opened to the public on 4 January 2000.
Q. Why does traffic build up so quickly on the bridge?
The bridge has only two traffic lanes and carries a mix of local vehicles, buses, goods carriers and container trucks. Congestion at Kundannoor Junction or damaged road sections can therefore produce long queues.
Q. Is there a plan to build another road link to Willingdon Island?
A four-lane NH 966B port-connectivity corridor from the Nettoor side towards CIFT Junction has been proposed, but alignment issues have delayed the project and it is not yet an operational alternative.
Q. Does Kochi Metro run across Kundanoor Bridge?
No. Kochi Metro does not cross the bridge. Vyttila and Thaikoodam are useful Metro stations in the wider area, with road transport needed for the final connection to Kundannoor or Thevara.